Ripon, California Hydropillar®
CB&I was awarded a contract with the City of Ripon, California to design, fabricate, construct and coat a 2.5 million gallon Hydropillar® located in the middle of the City’s new Mistlin Sports Complex.
PUL Alliance Waterspheroid®
PUL Alliance selected CB&I to provide a 500,000 gallon Waterspheroid® elevated tank in Blue Springs, Mississippi.
Jonesboro City Water and Light Standpipe
Jonesboro City Water and Light selected CB&I to provide a steel standpipe in Jonesboro, Arkansas
City of Spokane ESD™ Egg-Shaped Digesters
The City of Spokane, Washington, selected CB&I to provide two ESD™ egg-shaped digesters.
City of Piperton Waterspheroid® Elevated Tank
The City of Piperton, Tennessee, selected CB&I to provide a Waterspheroid® elevated tank.
City of Darien Standpipe
The City of Darien, Illinois, selected CB&I to provide a steel standpipe.
Charter Township of Northville Waterspheroid® Elevated Tank
The Charter Township of Northville chose CB&I to build an elevated steel tank in Northville, Michigan. CB&I was responsible for the engineering, fabrication and construction of the tank.
Hyperion Egg-Shaped Digesters (ESD™)
The installation of egg-shaped digesters (ESD™) at this California water treatment plant increased treatment capacity while conserving space.
World’s Largest ClariCone® Clarifiers
The installation of ClariCones provided the Albany Water, Gas and Light Commission with a cost-effective way to lower turbidity in the city's water.
Westminster Reservoirs
After the failure of a 5-million-gallon concrete water reservoir, the City of Westminster, California, retained CB&I to build two new all-welded-steel reservoirs.
Jefferson County Hydropillar® Elevated Tank
When Jefferson County, Alabama, needed a major expansion of its wastewater flow, officials contracted CB&I to build a 3-million-gallon Hydropillar complete with a treatment laboratory and office facility.