Aasta Hansteen Spar Topside

Statoil Petroleum AS contracted CB&I for Front End Engineering and Design work for the Aasta Hansteen Topside project.

Baku-Tbilisi-Ceyhan Pipeline

CB&I performed a number of contracts for the engineering, procurement and management assistance of a 1,760 kilometer (1,094 mile), 42 in./46 in. oil export pipeline from Baku, Azerbaijan to Ceyhan, Turkey, via Tbilisi, Georgia.

Boabab FPSO Topsides

CB&I completed the detailed engineering and procurement services for the topsides process and utility modules for the Boabab FPSO Topsides project.

Buzzard Enhancement Platform

CB&I performed the Buzzard Enhancement Platform project for Nexen Petroleum in the Central North Sea, off the coast of the United Kingdom.

Buzzard Offshore Platform Topsides

The Buzzard field development, operated by Nexen Petroleum U.K. Ltd. and its partners, is one of the largest North Sea crude oil projects in more than a decade.

Goliat FPSO

Hyundai Heavy Industries contracted CB&I to perform the early detailed engineering phase (to AFD status) and provide technical input for the Goliat FPSO project.

Greater Ekofisk Area 2/4L FEED

CB&I was contracted by Aker Solutions and ConocoPhillips to perform the FEED on the new Offshore Utilities & Accommodation Facility topsides.

Hoegh LNG Floating LNG FPSO

After successfully completing the pre-FEED study, CB&I was awarded the FEED contract for the topside facilities for an LNG FPSO.

Kashagan Full Field Development FEED

Agip KCO (Agip Kazakhstan North Caspian Operating Company) contracted K-WAC, a joint venture between Worley Parsons, Aker Kvaerner, and CB&I, to perform the FEED on the Kashagan Full Field Development Project.

Khuff Gas Development Platform

CB&I was awarded the EPC, commissioning and start-up contract for the Khuff Gas Development Platforms by ADMA-OPCO, a subsidiary of ADNOC.

Kizomba A Tension Leg Platform

ExxonMobil awarded the contract for the Kizomba A Tension Leg Platform (TLP) to CB&I.

Magnolia Tension Leg Platform

Conoco awarded CB&I a contract to perform the engineering, procurement and construction management for a complete Floating Production System

Molikpaq Oil Treatment & Gas Disposition Modules

Sakhalin Energy Investment Company contracted with CB&I to upgrade the Molikpaq platform in Russia.

Neftegas Sakhalin 1Field Development

CB&I was contracted by Exxon Neftegas Ltd. to perform FEED and subsequently EPCm for the Sakhalin I Field Development project.

Skarv-Idun FPSO

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted CB&I to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO.

South Caucasus Pipeline

CB&I was awarded the FEED, detailed engineering and procurement services for the 42 in., 700 kilometer gas export pipeline from Sangachal, Azerbaijan – south of Baku – to the Turkish border by BP Caspian Ltd.

Tupi-1 FPSO (Cidade de Angra dos Reis MV-22)

CB&I was awarded a contract for the conceptual design and detailed engineering services for the FPSO topsides for the Tupi Pilot project.

Tupi-3 Guara FPSO (Cidade de Sao Paulo MV-23)

MODEC awarded the engineering work for a new FPSO to CB&I on behalf of the owner, Petrobras.